A Moss-Tank Design LNG Carrier Vessel
As part of the preparations required for the supply of LNG to its customers, the group has planned to invest in assets such as LNG carriers shown below:
LNG Carrier |
Storage Capacity |
First Vessel |
50,000 metric ton (110,000 cubic meters) |
Second Vessel |
50,000 metric ton (110,000 cubic meters) |
Third Vessel |
100,000 metric ton (220,000 cubic meters) |
Total Investment |
US$480 million (based on 2003 cost survey) |